Rampa 04Çorlu

Blog
Taşımacılık,sade bir dille.
Rehberler, pratik notlar ve sahadan deneyimler. Yükü planlayan ekibin kaleminden.
- Yazı6
- Okuma süresi4 dk

Blog
Taşımacılık,sade bir dille.
Rehberler, pratik notlar ve sahadan deneyimler. Yükü planlayan ekibin kaleminden.
- Yazı6
- Okuma süresi4 dk

Blog
Taşımacılık,sade bir dille.
Rehberler, pratik notlar ve sahadan deneyimler. Yükü planlayan ekibin kaleminden.
- Yazı6
- Okuma süresi4 dk
Yazılar
Planlama masasından notlar.
Fiyat, yükleme, evrak ve sigorta üzerine pratik rehberler. Sevkiyatınızı planlarken başvurabileceğiniz yazılar.
Yazılar06
En yeni6 Oct 2026
6 yazı gösteriliyor
No. 01Guide6 Oct 20264 min okuma
Incoterms in plain words: who pays, who carries the risk
Eleven terms exist and four cover nearly every load. What EXW, FCA, FOB, CIF, DAP and DDP mean when something goes wrong.
No. 02Customs24 Sep 20264 min okuma
Five reasons freight is held at customs and how to avoid it
Vague descriptions, wrong codes, numbers that disagree. Nearly every hold can be fixed before the goods leave the factory.
No. 03Report15 Sep 20264 min okuma
On-time report 2025: 98.4 % of 1.2 million loads
How we count a load as on time, the figures by mode, and what caused the 19,200 that were late.
No. 04Guide2 Sep 20264 min okuma
How to build a pallet that arrives whole
Most damage happens slowly, on an ordinary road. Four more minutes at the wrapping stage prevent it.
No. 05Guide20 Aug 20264 min okuma
Sea, air or rail from Asia: which one for which load
36 days, 16 days or 3. The rate is the smaller part of the sum; the stock you cannot sell yet is the larger.
No. 06Report5 Aug 20264 min okuma
Peak season starts in August: a warehouse plan
A fifth of the year's orders arrive in six weeks. What to settle with your warehouse before the first one does.
Yazılar
Planlama masasından notlar.
Fiyat, yükleme, evrak ve sigorta üzerine pratik rehberler. Sevkiyatınızı planlarken başvurabileceğiniz yazılar.
Yazılar06
En yeni6 Oct 2026
6 yazı gösteriliyor
No. 01Guide6 Oct 20264 min okuma
Incoterms in plain words: who pays, who carries the risk
Eleven terms exist and four cover nearly every load. What EXW, FCA, FOB, CIF, DAP and DDP mean when something goes wrong.
No. 02Customs24 Sep 20264 min okuma
Five reasons freight is held at customs and how to avoid it
Vague descriptions, wrong codes, numbers that disagree. Nearly every hold can be fixed before the goods leave the factory.
No. 03Report15 Sep 20264 min okuma
On-time report 2025: 98.4 % of 1.2 million loads
How we count a load as on time, the figures by mode, and what caused the 19,200 that were late.
No. 04Guide2 Sep 20264 min okuma
How to build a pallet that arrives whole
Most damage happens slowly, on an ordinary road. Four more minutes at the wrapping stage prevent it.
No. 05Guide20 Aug 20264 min okuma
Sea, air or rail from Asia: which one for which load
36 days, 16 days or 3. The rate is the smaller part of the sum; the stock you cannot sell yet is the larger.
No. 06Report5 Aug 20264 min okuma
Peak season starts in August: a warehouse plan
A fifth of the year's orders arrive in six weeks. What to settle with your warehouse before the first one does.
Yazılar
Planlama masasından notlar.
Fiyat, yükleme, evrak ve sigorta üzerine pratik rehberler. Sevkiyatınızı planlarken başvurabileceğiniz yazılar.
Yazılar06
En yeni6 Oct 2026
6 yazı gösteriliyor
No. 01Guide6 Oct 20264 min okuma
Incoterms in plain words: who pays, who carries the risk
Eleven terms exist and four cover nearly every load. What EXW, FCA, FOB, CIF, DAP and DDP mean when something goes wrong.
No. 02Customs24 Sep 20264 min okuma
Five reasons freight is held at customs and how to avoid it
Vague descriptions, wrong codes, numbers that disagree. Nearly every hold can be fixed before the goods leave the factory.
No. 03Report15 Sep 20264 min okuma
On-time report 2025: 98.4 % of 1.2 million loads
How we count a load as on time, the figures by mode, and what caused the 19,200 that were late.
No. 04Guide2 Sep 20264 min okuma
How to build a pallet that arrives whole
Most damage happens slowly, on an ordinary road. Four more minutes at the wrapping stage prevent it.
No. 05Guide20 Aug 20264 min okuma
Sea, air or rail from Asia: which one for which load
36 days, 16 days or 3. The rate is the smaller part of the sum; the stock you cannot sell yet is the larger.
No. 06Report5 Aug 20264 min okuma
Peak season starts in August: a warehouse plan
A fifth of the year's orders arrive in six weeks. What to settle with your warehouse before the first one does.